Portland, OR
This 10 story, 250,000 square foot facility features the St. Vincent Integrated Cancer Center as it’s major tenant. The building’s shell features a combination precast concrete/glazed skin covering a structural steel frame with integral brace frames that bear spread footings and a partial basement . The interior improvements include five new elevators, an ornate main lobby and large conference rooms on the first level, and a roof garden on the second floor. The facility is connected to the adjacent North Parking Structure via a new pedestrian tunnel.

print
All Rights Reserved. © 2004 Andersen Construction Inc.Site created by serumcreativelab