 | | Adventist Medical Center Expansion 200,000 SF steel-framed patient tower and 4-level, 475-stall parking garage. |
|
 | | Good Samaritan West Tower Expansion 6-story, 60,000 SF surgery and critical care tower and 19,000 SF renovation to the existing hospital, located in Corvallis, OR |
|
 | | Kaiser Sunnyside Parking Structure 5-level precast concrete garage in Clackamas, OR includes 736 parking spaces within 237,000 SF. |
|
 | | Kaiser Westside Medical Center 900,000 SF greenfield hospital includes hospital & nursing towers, central plant, medical office building and parking structure. |
|
 | | Mill Plain Office Building 5-story, 60,000 SF office building with 200 structured parking spaces, located in Vancouver, WA. |
|
 | | Nunhems Campus Expansion Located in Parma, ID, this 144,000 SF seed manufacturing expansion also includes a major renovation to the existing campus. |
|
 | | Oregon State University Energy Center LEED Platinum energy center building and steam distribution modifications to the Oregon State campus in Corvallis, OR. |
|
 | | Oregon State University ONAMI MBI 35,000 SF addition to existing facility includes laboratories, clean room and tool room space. |
|
 | | Providence Happy Valley Medical Plaza 2-story, 28,000 SF medical office building in Happy Valley, OR |
|
 | | Providence Hood River Expansion/Renovation 3-story, 36,000 SF hospital expansion, 38,000 SF renovation to the existing hospital and a new central utility plant. |
|
 | | Southwest Washington Medical Center Firstenburg 4-6 Buildout 3-floor, 78,000 SF buildout in a JV with Hoffman Construction will complete the 8-story patient tower. |
|
 | | Seattle Municipal Tower Equipment Replacement Replacement of the existing window washing equipment atop the 64-story downtown skyscraper. |
|
 | | Shriners Childrens Hospital Expansion and Renovation 3-story, 73,000 SF expansion built above and floor-by-floor to the existing hospital along with 62,000 SF of renovations. |
|